Data sheet

Equipment used for this installation

  • Madrid
  • Enair Wind Turbine 70 to 220V
  • 12m Octagonal Tower
  • WindiBoy 5000TL Inverter
  • Bidirectional Counter
Wind power
Wind power

Wind data of daily, monthly and annual generation.

  • WIND SPEED SHAFE HEIGHT 4,26 m/s
  • DENSITY FACTOR: 0% %
  • AVERAGE OUTPUT POWER: 350,32 W
  • ANNUAL ENERGY: 3.066 kWh/año
  • MONTHLY ENERGY: 255 kWh/mes
  • OPERATING TIME: 87,4% %
  • MARGIN OF LOSSES: 0%
  • DAILY ENERGY: 8,4 kWh/día
  • (*Assuming correct wind speed)
Global results

Total and maximum generation.

  • GENERATION AVERAGES
  • Total wind 8,4
  • Photovoltaic 0
  • MAXIMUM ATTAINABLE:
  • Total wind 66,0
  • Photovoltaic 0
Tabla de frequencias (%)
Direction Frecuencia Velocidad
N 8.00 8.50
NNE 3.00 6.00
NE 2.00 5.50
ENE 2.00 5.50
E 3.00 6.00
ESE 6.00 7.00
SE 6.00 6.80
SSE 6.80 6.00
S 9.00 6.00
SSW 9.00 6.00
SW 9.00 6.00
WSW 10.00 7.00
W 10.50 7.20
WNW 10.00 7.20
NW 10.00 8.00
NNW 10.50 9.00

Frequencies Rose (%)

Speeds Rose (M/S)

Union Fenosa, Self-consumption

The energy company Union Fenosa, installs a renewable plant, combining a mini wind turbine with photovoltaic. Enair was the company selected after a competition by the company and was responsible for the installation and the supply of the mini wind turbine Enair 70. With this installation Union Fenosa will do different tests of integration and will get to know the behaviour of this technology in greater depth.

Located in the centre of Madrid in the Corporate University of Unión Fenosa, at 193 Antonio López street is this test centre with renewable technologies through which the company will be able to evaluate both the performance and the optimal functioning of the equipment in terms of synchronisation with the network and many other factors that the laboratory decides to check.

The wind turbine Enair 70 connected to the LINTER laboratory ( The grid Integration laboratory) is being measured and evaluated by the company through a bidirectional meter and continuous monitoring and remote control that deliver all the parameters of generation with the minimum detail.

This installation consists of one wind turbine Enair 70 along with a photovoltaic plant, which is also evaluated in the same integration laboratory. Both have been thoroughly reviewed by the company's top managers and will undergo multiple processes and trials that will determine the final integration results.

Union Fenosa will also have one of these wind turbines in its installations, and will be placed in an advantageous state in anticipation of new legislative developments.